Hydro-energy

REEL are experts in equipping, renovating and upgrading lifting equipment for hydro-electric plants across the world.

REEL and REEL COH are capable of providing high-performance technical solutions, regardless of the size of the plant.


REEL COH, based in Canada and in the USA, has been designing, manufacturing and installing lifting equipment for nearly 50 years.


This level of expertise, built-up via their North American markets, helps us deal with the most complex engineering projects across the world, resolving the most difficult problems.

  • gantries,
  • stationary hoists,
  • turbine hall cranes, etc.

REEL COH has supplied the majority of lifting equipment for powerhouses in North America in extreme environments for the last 30 years :


References :


  • USACE (United States Army Corps of Engineers), three sites along the Snake river in Washington State: replacement of the water intake gantry cranes, capacity 135,000 kg.
  • Manitoba Hydro – Slave Falls dam: replacement of the hoisting winch trolley for the spillway gates, 75,000 kg, with a dual-rail rack and pinion system of 25,000 kg for the handling of the stop logs.
  • Ontario Power Generation – Saunders power house : replacement of the turbine gantry crane with a capacity of 300,000 kg; mass of the equipment: 400,000 kg.
  • Ontario Power Generation – Niagara Falls site: supply and fitting of a hoist, superstructure and tunnel isolation gates and stoplogs, capacity 160,000 kg.
  • Hydro Quebec, Romaine 3 powerhouse : supply and testing of turbine hall crane , capacity 380,000 kg.

In France, these skills are passed on by our subsidiary MC LEVAGE – REEL  and our agency responsible for the maintenance and refurbishment of lifting equipment for the hydro-electricity industry.

Join a dynamic group! we have about 200 vacancies
Reel, we hire all over the world

Join us at 2020 virtual ICSOBA, November 16th to November 18th !

Come and visit us,  we will be available each  day from 06:00 through 18:00 CET.

EPR UK Hinkley Point new milestone on Unit 2

NFM Systems has designed and calculated the complete Liner.

WNE 2020 postponed to 2021

WNE is mobilized for your health and safety!

REEL-Alesa materials handling equipment : Refinery reached full capacity

REEL Alesa is proud having participated to EGA’s Al Taweelah alumina refinery