REEL to support NALCO during INALT 2020

“REEL Aluminium Division, REEL NKM Noell, REEL Alesa,  altogether to support NALCO during INALT 2020.”

“Mr. Mishra, (Executive Director S&P Nalco Angul) discovering our latest equipment at real scale with REEL VR Station.”

Join a dynamic group! we have about 200 vacancies
Reel, we hire all over the world

ITER Council milestone #50 successfully achieved . WELL DONE to ALL

It was a display of Titans, with no less than 1,000 tonnes of steel and concrete test loads attached to the giant hoists

ITER : Upending the steel cradle

Travelling the entire length of the assembly space (~ 170 metres), the REEL overhead cranes will be the workhorses

EDF Innovation Challenge : Archimedes’ buoyancy at REEL’s service

How to handle a 17-ton rack with a 2-ton overheadcrane?

Some news from ITER : load tests on the assembly bridge cranes

Testing the load path