REEL COH Wins Significant Contract With BC Hydro

BC Hydro awarded REEL COH with a significant contract for the design, supply, installation and commission of the powerhouse bridge and gantry cranes for the Site C Project.

The scope of work includes two 320 metric tons capacity overhead bridge cranes, one 130 metric tons capacity headworks gantry crane and one 80 metric tons capacity tailrace gantry crane.

The Site C Clean Energy Project is a hydroelectric dam and generating station under construction on the Peace River in Fort St. John in northeastern British Columbia in Canada. Once built, Site C will provide clean, reliable and affordable electricity for more than 100 years to as many as 450000 homes a year. The dam is slated for completion in 2024.

Join a dynamic group!
we are always on the lookout for new talents!
Reel, we hire all over the world

Meet REEL and CNIM Systèmes Industriels on WNE

The 2023 edition of the World Nuclear Exhibition (WNE) will be held at Paris-Nord Villepinte from 28 to 30 November 2023

Flamanville EPR: A challenge successfully met by REEL

REEL is proud to have contributed again to the activities of Flamanville 3 by providing particularly robust clamps.

REEL at the International Aluminium conference

REEL Aluminium team will be at the International Aluminium conference at Stands 8 and 9 in Vedanta Meadows Auditorium.

REEL wishes you a happy new year 2023

Our teams wish you all the best for this new year.